Build software with clients, not for them

How we build client software together: ideas go in one place, plans and screens are approved by people, and every wait is visible to whoever it's waiting on.

Teleperson Team · November 19, 2026 · 5 min read

Software projects with clients rarely fail on the code. They stall in the gaps between people: an idea sits in an email nobody owns, a plan waits a week for sign-off, a finished screen waits for someone to look at it. We've started building client software differently, in a shared hub where the client, their AI coding agent and our engineers work from the same record. The main thing we've learned is that most delay is waiting, and waiting only shrinks once everyone can see whose turn it is.

One path from idea to release

Every request follows the same path. A client describes an idea. Their AI coding agent drafts a plan. The client approves or adjusts it. The agent builds it in the client's own copy of the code, and the client reviews the changed screens. Our engineers review the code and put it on a preview site, the client accepts it there, and it's merged and released.

Each step on that path says who it's waiting on: the agent, the client, our engineering team or the people who deploy. That one detail changes the conversation. Instead of "where are we on this?", the board answers "this has been waiting on us for two days" or "this plan has been waiting on you since Tuesday." Each morning, everyone gets a short email listing only what's waiting on them.

A recent example: a pharmacy's facility portal needed a way for staff to build an option, add products to it and confirm it. The idea, the plan, the screen review and the preview each had an owner and a timestamp, and the whole three-step builder ran on sample products and prices.

Approvals belong to people

Two rules sit at the center of the hub, and we wrote them into the code rather than a policy document.

An AI agent can report, but it can never approve. The client's coding agent can propose a plan, say it has finished a build, or flag that it's blocked on a missing API. It cannot approve its own plan or accept its own screens. Those decisions belong to the people who will live with the result.

We can't approve on the client's behalf. Our engineers review the code, but a plan or a screen the client hasn't accepted isn't accepted, however obvious it seems to us. It can slow things down. It also means a client is never surprised by what ships.

These rules are easy to state and surprisingly easy to erode. The tempting shortcut is always "it's a tiny change, I'll just approve it." Making the rule part of the system, not a matter of discipline, is what keeps it.

The log is the source of truth

Nothing about an item is edited in place. Every change, from "plan proposed" to "changes requested" to "merged", is appended to that item's history as an event, and the current stage, the timings and the score are worked out by replaying the history.

We chose this because arguments about timelines are usually arguments about memory. When the history is the record, there's nothing to argue about: you can see exactly when a plan was proposed, how long it waited, and how many review rounds it went through. It also means a metric can be recalculated if we change the formula, rather than being frozen at whatever we stored at the time.

Measuring concept to complete

The headline measure is lead time: from the moment an idea is submitted to the moment it's first merged. We call it concept to complete. Alongside it, we track:

  • Waiting by party: how much of the lead time was spent waiting on the client, the agent, engineering or deployment.
  • Blocked time by reason, such as a missing API or a preview that wasn't deployed.
  • First-pass acceptance: items that went through without a "changes requested" review or an extra round of UI feedback.
  • Complexity agreement: whether the agent's estimate of Low, Medium or High matched our engineers'.

Each item also gets a simple score that combines speed against a target with how many review rounds it needed. Our starting targets are five days for a Low item, ten for Medium and twenty for High. We want to be candid that these are placeholders. We'll calibrate them for each client after about ten completed items, and we write every change to the formula down in the same change that makes it.

What was hard

The honest answer is that tooling was the easy part. The hard part was agreeing that time spent waiting on us counts against us, in front of the client. It's uncomfortable to put "waiting on engineering review" on a shared board. It's also the fastest way we've found to make engineering review faster.

We'd also do one thing earlier: agree on API contracts at the plan stage. A screen built against an API that doesn't exist yet is a screen that waits, and the plan is the cheapest place to catch that.

Building for a client means they hand you a request and wait. Building with them means they can see every step, own every decision that's theirs, and know at any moment who has the next move. The code is the same either way. The difference is who gets to see the work, and in our experience that's what makes it go faster.